What gets checked
- Electrical — sockets, switches, breakers, earthing
- Plumbing — water pressure, leaks, drains
- Finishes — wall cracks, uneven paint, hollow tiles, floor level
- Doors and windows — closing, seals, rain leaks
When to inspect
Before the ownership transfer date, then re-inspect after the developer's fixes.
How to prepare
- Get the unit floor plan from the developer
- Book a day when power and water are on
- Allow 2–4 hours